Connect with us

Bulloch Public Safety

SEGA Weekly Traffic Interruption Advisory – Ending 5/15/20

There’s a long list of road projects across Southeast Georgia this week –>

Georgia DOT continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, May 9 through Friday, May 15.

The Button - donate today!

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers

Lane closures are listed below by interstate and counties.

Interstate 95
Exit 6 interchange project in Camden County
Single Lane Closures (LC) Milepost (MP) 5 to 7
7am to 7pm Wednesday – Friday
median guardrail installation

Bridge Rehab Projects in Camden County
Exit 3 interchange bridges and Satilla River Bridges north of Exit 14
Mon-Thurs 7pm-7am single LC/10pm-5am double LC
Weekend LC remain in place 9pm, Fri through 5am, Mon
Additional LC on SR 40/East King Ave & Boone St at Exit 3

Appling County
SR 27 MP 0 to 8.57
Slow-moving operation for new RPMs
Rolling lane closures between Tues. –  Thurs.

Bulloch County
SR 67 North of Mill Creek Bridge to Jenkins County Line
Lane closures for Milling and Resurfacing work
Monday – Sunday 8 am to 7:30 pm

Charlton County
SR 185 MP 0 to MP 13
Slow-moving operation for new roadway striping
Monday – rolling lane closures

Chatham County 
CR 787 Islands Expressway 
Elba Island Rd. to Oatland Island Rd.
Lane closures Monday – Saturday 9am until 3pm
Mobilize equipment and materials for Bridge Construction

SR 204 at White Bluff Rd. and Mall Blvd. intersections
Lane Closures at intersections for new roadway striping
Monday – Friday 9 pm until 6 am

US 80 at Skidaway Road and Allen Blvd. intersections
Lane closures at intersections for new roadway striping
Monday – Friday 7 pm until 5 am

SR 21 at Groves High School
Denmark St. to Chatham Villa Dr.
Lane closures for pulling grid in median
Sun. – Sat. 6 pm to 6 am and 9 am to 3 pm

Clinch County
SR 89 MP 0 to MP 32 Tues. – Thus.
SR 94 MP 0 to MP 1.27 Friday
Rolling daytime lane closures for new roadway striping

Glynn County
Sidney Lanier Bridge on US 17/SR 25
Lane Closures for Bridge Rehab work
Monday through Sunday 6 am to 6 pm

SR 25 Spur/Torras Causeway
From US 17 and extending to Kings Way
Nightly lane closures 8 p.m. until 6 a.m., starting May 15
Resurfacing, bridge joint work and bike safety enhancement

Jeff Davis County 
SR 135 MP 0 to 16.2
Slow-moving operation for new RPMs
Rolling lane closures between Tues. –  Thurs.

SR 19 RR Overpass Construction
Detour via SR 135 and SR 135 Conn.
Anticipated completion 2020

Screven County
SR 73 Rocky Ford Rd. to Bascom Rd.
Single Lane Closures for Intersection improvements
Monday – Saturday 8 am to 8 pm

SR 21 Bus. Newington North of SR 21 to SR 21
Single Lane Closures for Milling and Resurfacing
Monday – Saturday 7:30 am until 7 pm

Telfair County
SR 30 between Walnut St. to Grady Ave. (Mileposts 6-7.5)
Lane closures with flagging for paving operation
Monday – Thursday, 6 am until 6 pm

SR 30 MP 9.71 to 10.08 & SR 27 MP 0.0 to 1.0
Slow-moving operation for new RPMs installation
Tues. – Thurs. rolling lane closures

Ware County
SR 158 between Hutch Lane and Barnes Road
Road closure for three bridges to be replaced
anticipated open to traffic spring/summer 2020


Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close the shoulders and lanes at the locations below for the 16@95 Improvement Projects, which will widen I-16 and reconstruct the I-16/I-95 Interchange. For daily traffic impacts and real-time traffic alerts, please visit Georgia NaviGAtor at www.511ga.org.

*NOTES: Detour information is shown using red text.

Sunday, May 10 through Saturday, May 16, from 9 a.m. to 3 p.m. (Daily)

Right and left shoulder closures at the following locations:

  • I-16 eastbound (milepost (MP) 156) to I-95 southbound ramp (MP 99)
  • I-16 westbound (MP 157) to I-95 northbound ramp (MP 100)
  • I-16 eastbound (MP 158) to I-95 northbound ramp (MP 100)
  • I-16 westbound (MP 158) to I-95 southbound ramp (MP 99)
  • I-95 northbound (MP 99) to I-16 eastbound ramp (MP 158)
  • I-95 northbound (MP 99) to I-16 westbound ramp (MP 157)
  • I-95 southbound (MP 99) to I-16 eastbound ramp (MP 158)
  • I-95 southbound (MP 100) to I-16 westbound ramp (MP 158)

Right shoulder closures at the following locations:

  • I-16 eastbound from I-95 (MP 156) to Chatham Parkway (MP 163)
  • I-16 westbound from Chatham Parkway (MP 163) to I-95 (MP 155)

Monday, May 11 through Friday, May 15, from 9 a.m. to 3 p.m. (Daily)

Intermittent right and left lane closures at the following locations:

  • 1-16 eastbound from I-95 (MP 157) to (MP 159)
  • 1-16 westbound from (MP 159) to I-95 (MP 157)

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *