Connect with us

Bulloch Public Safety

SE Ga Road Work: Weekly Traffic Interruption Advisory Through December 10

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, December 3 through Friday, December 10.

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.


Interstate 95

I-95                                                      McIntosh County
Champney R. Bridge (MP 45.5) to Darien River Bridge
Lane Closures for Bridge Maintenance/Rehabilitation
Mon.- Thurs. 7pm-7am
Weekends – 9pm Fri. until 5am Mon.
Thru October 31, 2023

Interstate 16 
I-16 (in the Vicinity of SR 307)         Chatham County
Lane Closures for DDI Construction on Exit 160/SR 307
Eastbound MP 159.8 to MP 160.2

  • Monday – Saturday 9am – 4pm

Westbound from MP 159.8 to MP 160.2

  • Monday – Saturday 8am – 3pm

Exit 160/SR 307 Pine Meadow Drive to Town Center Drive

  • Monday – Saturday 8am – 3pm

Through Dec. 31, 2022

Interstate 16
I-16                        (Bulloch, Bryan, Chatham Counties)
Lane Closures for Joint Work Repair
Eastbound MP 143-152
Westbound MP 152-143
Nightly Monday – Saturday 7pm – 7am
Eastbound MP 137- 143
Daily Monday – Saturday 7am – 4pm

I-16                                                      Chatham County
Effingham/Chatham Co. line to Exit 155
Nightly lane closures to repair concrete pavement

Interstate 516 

I-516 Mildred St. to Railroad Bridge (MP 6.68) Chatham County
Pavement Marking Installation
Nightly Lane Closures Tuesday 12/06/2022 – 12/09/2022

Bridge & Road Closures with Detours

Daisy Nevils Rd                                 Evans County
Road Closure for Bridge Replacement
Expected Reopen End of March 2023
Detour via Deloach Church Rd & Mosley Rd

Ogeechee Creek @ Ogeechee Rd    Screven County
Road Closure for Bridge Replacement
Expected Reopens end December 2022
Detour via Goloid Church Rd., US 301 East, Goloid Church Rd. West

US 82 West @ Big Creek                  Brantley County
Road Closure for Bridge Replacement
3 Miles West of Hoboken
Expected Reopen in Early 2023
Single Lane Traffic in Both Directions thru Work Zone
On-site Detour: WB Traffic Shift to EB Bridge

Stanfield Road @ Reedy Creek        Wayne County
Road Closure for Bridge Replacement
Expected to Reopen January 2023                          
Detour via Michael Mikell Lake Rd., Tyre Bridge Rd., US 84

Piney Grove Rd at Colemans Creek Appling County
Road Closure for Bridge Replacement
Expected to Reopen Late December 2022
Detour via SR 203, SR 121, SR 15

Bridge Construction, Rehabilitation, and Maintenance

State Route 25                                   Chatham County
Appleby Road (MP 19) to the South Carolina State Line (MP 21)
Alternating Left and Right Lane Closures for Bridge Construction
Monday – Saturday 9am – 4pm  Through February 28, 2023

SR 4/US 1 Over Altamaha River           Appling-Toombs Co.
West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.)
Daily Lane Closures for Bridge Construction Activities
Monday thru Friday, 7am to 6pm (Completion Dec.)

Resurfacing

SR 204/Fort Argyle Rd                      Chatham County
From Old River Rd to Gateway Blvd
Lane Closures for Asphalt Resurfacing
7pm to 6am, Monday – Friday

SR 26/HWY 80                                    Chatham County
From Bourne Ave to Wilkes Street
Daily/Nightly Lane Closures for Resurfacing
9pm to 6am,
Friday 12/02/2022 – 12/09/2022 (12/30/2022)

SR 196/SR 119                                   Liberty County
From Airport Road to General Screven Way
MP 0.0 to 3.51 SR 196
Nightly Lane Closures for Milling and Resurfacing
7pm to 5am
Monday- Saturday 12/04/22 – 12/09/2022

SR 27                                                  Wayne County
East Railroad St to the Glynn County Line
MP 7.33 to MP 35.41
Daily/Nightly Lane Closures for Resurfacing
4/20/22 – 12/31/22

SR 25 Connector (Gloucester St.)    Glynn County
SR 27 to SR 25
MP 7.33 to MP 35.41
Nightly Lane Closures for Resurfacing
7pm to 6am
9/12/22 – 12/31/22

CR 577 Nevils Denmark Rd              Bulloch County
RP Miller Rd to SR 46
Daily Lane Closures & Flagging Operation
for Paving & Traffic Signal Install
8am to 6pm
11/30/2022-12/30/2022

SR 21 Business 21/Leola Road        Screven County
MP 16.58 to MP 0
Daily Lane Closure & Flagging Operation
Mill & Resurfacing
7am to 7pm
Starting 12/2/2022 to 12/24/2022

Other Traffic Interruptions

SR 520                                                Glynn County
New traffic signal activation Dec. 6
at Ashton Dr./Pilot Lane near I-95

SR 130                                                Montgomery County
Re-alignment of SR 130 east of Mt. Vernon
New stop condition at Petross Road
SR 130 permanent road closure between Petross  Rd. & SR 135
Affective date scheduled for Wed., Dec. 7

SR 252                                                Camden County
New Post Rd (MP 8.9) to SR 25 (MP 12.76)
Drainage repair

SR23/SR57                                       Tattnall County
SR169 to SR121
Daily Lane Closures for Road Widening
8am – 3pm
Starting 10/27/22 – 12/10/23

SR 21/SR 30                                       Chatham County
I-95/SR 405 to Berrien Rd                              
Nightly Lane Closures for Earth Work on Shoulders and Median
Starting 7pm-6am
Monday 12/04/2022 – Saturday 12/10/2022

SR 40                                                  Camden County
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday thru Friday, 7am to 5pm
Ends 3/23/2023

SR 21 MP 6.6 to MP 27.7                   Effingham County
Installation of Cable Barrier
Lane Closures Mon. – Fri. 9am-3:30pm & 7pm-6am
Daily/Nightly Lane Closures Saturday and Sunday
3/31/22 – 12/31/22

SR 25/Burnsed Blvd.                         Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm
12/04/2022 – 12/09/2022

  • Burnsed Boulevard reduced to two lanes from Hwy 80 through

the intersection of SR 25. Traffic will move to the southbound lanes,
which will become one lane in each direction.

  • SR25 North from Bay Street closed to through traffic. Only trucks

needing access to Foundation Drive.


Advisory: Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling thru work zones. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *