Connect with us

Muscogee Public Safety

GDOT to Install New Right Turn Lanes on Georgia 22/Beaver Run Road at Psalmond Road

Plan ahead –>

What: On Thursday, Jan. 30, 2020, road construction crews will start a Georgia DOT Quick Response project to install new designated right turn lanes on US 80/Georgia 22/Beaver Run Road at the Psalmond Road intersection. The new right turn lanes will be created in both eastbound and westbound lanes of Georgia 22, providing easier access for motorists turning on to Psalmond Road. The project is expected to be complete within the beginning of March, 2020.

Pro Roof GA

Drivers are urged to be alert to the crews and their equipment in the area throughout the duration of the project. Lane closures may need to be enacted at times. When closures are in place, signage will be posted in advance of the work zone, and signal flaggers may be on site to direct motorists. Drivers are encouraged to slow their speeds through the area and to drive carefully through the work zone.

When: Starting Thursday, Jan. 30, 2020 and to be completed within the beginning of March, 2020

Where: US 80/Georgia 22/Beaver Run Road at the Psalmond Road intersection in Muscogee County, Georgia

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *