Connect with us

Bulloch Public Safety

Excelsior Church Road in Candler County to close March 22 for local bridge replacement

According to Georgia Department of Transportation, Excelsior Church Road at Ten Mile Creek Bridge south of I-16 at Pulaski-Excelsior Road (Exit 111) interchange will close to thru-traffic for 120 days starting Monday, March 22 for a bridge replacement project.

The contractor, The Industrial Company (TIC), will prepare and maintain the detour around the closure, which utilizes Jones Road, Turner Road and Dutch Ford Road. Motorists can access residences in the area up to the work zone. For the safety of the public, unauthorized personnel and motorized vehicular are not permitted in the construction zone.

This $1 million project will replace the current weight restricted bridge built in 1969. If the weather cooperates, the project is expected to be completed in October of this year.

Source: GDOT / Click to enlarge

Advisory from GDOT:  Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app. Our maintenance team members who repair roads and bridges and our project teams who oversee construction projects are continuing their essential work, while following sanitary work practices prescribed by health agencies to protect themselves and the public from the coronavirus, as are most state DOTs in the U.S. 

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *