Connect with us

Bulloch Public Safety

SE Ga Road Work: Weekly Traffic Interruption Advisory Through February 24

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, February 18 through Friday, February 24.

The Button - donate today!

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.


Interstate 95

I-95                                                          McIntosh County
Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0) 
Lane Closures for Bridge Maintenance/Rehabilitation
Monday- Thursday 7pm-7am
Weekends – Friday 9pm until Monday 5am
Thru October 31, 2023

I-95                                                         Glynn County
MM 53- 55 NB
Single Lane Closure for Message Board Installation
Wednesday February 22
9 pm until 6 am

Interstate 16                            

I-16 (in the Vicinity of SR 307)                 Chatham County            
SR 307 Bridge closure over I-16
7pm Feb. 22 – 7pm Feb. 26

  • Follow signed detour

Lane Closures for DDI Construction on Exit 160/SR 307
Eastbound MP 159.8 to MP 160.2

  • Monday – Saturday 9am – 4pm

Westbound from MP 159.8 to MP 160.2

  • Monday – Saturday 8am – 3pm

Exit 160/SR 307 Pine Meadow Drive to Town Center Drive

  • Monday – Saturday 8am – 3pm

Continue thru end of March 2023

Bridge & Road Closures with Detours

Daisy Nevils Rd                                    Evans County
Road Closure for Bridge Replacement
Expected Reopen End of March 2023
Detour via Deloach Church Rd & Mosley Rd

Ten Mile Church Rd. @ 10 Mile Creek Bacon County
Road Closure for Bridge Replacement
Starting Monday, January 16 for 180 days
Expected to Reopen in July 2023
Detour via Radio Station Rd, S Pierce St., SR 32, SR 203

Bridge Construction, Rehabilitation, and Maintenance

State Route 25                                   Chatham County 
Appleby Road (MP 19) to the South Carolina State Line
Alternating Lane Closures for Bridge Construction
Monday – Saturday 9am – 4pm  Through February 28, 2023

SR 4/US 1 Over Altamaha River       Appling-Toombs Co.
West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.)
Daily Lane Closures for Bridge Construction Activities
Monday thru Friday, 7am to 6pm (May 2023)

US 82 West @ Big Creek                  Brantley County
3 Miles West of Hoboken
WB Bridge Replacement Project
Single Lane Traffic in Both Directions thru Work Zone
Work Completion Expected March 2023

Resurfacing

SR 204/Fort Argyle Rd                      Chatham County
From Old River Rd to Gateway Blvd
Lane Closures for Asphalt Resurfacing
Monday – Friday, 7pm to 6am

SR 26/HWY 80                                  Chatham County
From Bourne Ave to Wilkes Street
EB and WB Daily/Nightly Lane Closures for Resurfacing
9pm to 6am

SR 196/SR 119                                  Liberty County
From Gate 1 to Gate 5
MP 7.15 to 7.15 SR 119
Nightly Lane Closures for Milling and Resurfacing
7pm to 5am
Friday – Saturday 2/17/23 – 02/24/2023

SR 27                                                Wayne County
East Railroad St to the Glynn County Line
MP 7.33 to MP 35.41
Daily/Nightly Lane Closures for Resurfacing
4/20/22 – 3/10/23

SR 38                                                Wayne County
CW Collins St (Screven) to SR 203
MP 2.38 to MP 8.98
Daily/Nightly Lane Closures for Resurfacing
12/8/22 – 3/31/23

SR 25 Connector (Gloucester St.)   Glynn County
SR 27 to SR 25
MP 7.33 to MP 35.41
Nightly Lane Closures for Resurfacing
7pm to 6am
9/12/22 – 2/28/23

SR 21 Business 21 / Leola Road     Screven County 
MP 16.58 to MP 0
Daily Lane Closure & Flagging Operation
Mill & Resurfacing
7am to 7pm
1/9/2023 – 3/31/2023

Old Highway 250                              Tattnall County
Mainline Left / Right Lane Closed due to Shoulder Widening
Monday – Saturday 7am – 8pm
Starting 2/20/2023 – 9/30/2023

Other Traffic Interruptions

SR23/SR57                                         Tattnall County
SR169 to SR121
Daily Lane Closures for Road Widening
8am – 3pm
Starting 12/20/22 – 12/10/23

SR 21/SR 30                                      Chatham County
I-95/SR 405 to Berrien Rd                              
Nightly Lane Closures for Earth Work on Shoulders and Median
Starting 7pm-6am
Monday – Friday

SR 40                                                Camden County
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday thru Friday, 7am to 5pm
Ends 9/30/2023

SR 21 MP 6.6 to MP 27.7                   Effingham County
Installation of Cable Barrier
Lane Closures Mon. – Fri. 9am-3:30pm & 7pm-6am
Daily/Nightly Lane Closures Saturday and Sunday
3/31/22 – 4/30/23

SR 25/Burnsed Blvd.                        Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm

  • Burnsed Boulevard reduced to two lanes from Hwy 80 through

the intersection of SR 25. Traffic will move to the southbound lanes,
which will become one lane in each direction.

  • SR25 North from Bay Street closed to through traffic. Only trucks

needing access to Foundation Drive.

SR 19                                                  Jeff Davis County
North Williams St (MP 12.13) to Pine St. (MP 12.46)
Lane closures from 9:00 p.m. Friday 24th till Sunday 26th
To repair concrete pavement

SR 4                                                    Appling County
Weaver St. (MP 9.70) to NW Park Ave. (MP 9.93)
Lane closures from 9:00 p.m. Friday 24th till Sunday 26th
To repair concrete pavement

SR 27                                                  Appling County
Dean St. (MP 10.83) to Tippins St. (MP 12)
Lane closures from 9:00 p.m. Friday 24th till Sunday 26th
To repair concrete pavement

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *