Georgia DOT continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, February 11 through Friday, February 17.
All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.
Traffic interruptions are listed below by interstates, categories, and counties.
Interstate 95
I-95 McIntosh County
Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0)
Lane Closures for Bridge Maintenance/Rehabilitation
Monday- Thursday 7pm-7am
Weekends – Friday 9pm until Monday 5am
Thru October 31, 2023
Interstate 16
I-16 (in the Vicinity of SR 307) Chatham County
Lane Closures for DDI Construction on Exit 160/SR 307
Eastbound MP 159.8 to MP 160.2
- Monday – Saturday 9am – 4pm
Westbound from MP 159.8 to MP 160.2
- Monday – Saturday 8am – 3pm
Exit 160/SR 307 Pine Meadow Drive to Town Center Drive
- Monday – Saturday 8am – 3pm
Continue thru end of March 2023
Bridge & Road Closures with Detours
Daisy Nevils Rd Evans County
Road Closure for Bridge Replacement
Expected Reopen End of March 2023
Detour via Deloach Church Rd & Mosley Rd
Ten Mile Church Road at 10 Mile Creek Bacon County
Road Closure for Bridge Replacement
Starting Monday, January 16 for 180 days
Expected to Reopen in July 2023
Detour via Radio Station Rd, S Pierce St., SR 32, SR 203
Bridge Construction, Rehabilitation, and Maintenance
State Route 25 Chatham County
Appleby Road (MP 19) to the South Carolina State Line
Alternating Lane Closures for Bridge Construction
Monday – Saturday 9am – 4pm
Through February 28, 2023
SR 4/US 1 Over Altamaha River Appling-Toombs Co.
West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.)
Daily Lane Closures for Bridge Construction Activities
Monday thru Friday, 7am to 6pm (May 2023)
US 82 West @ Big Creek Brantley County
3 Miles West of Hoboken
WB Bridge replacement project
Single Lane Traffic in Both Directions thru Work Zone
Work completion expected March 2023
Resurfacing
SR 204/Fort Argyle Rd Chatham County
From Old River Rd to Gateway Blvd
Lane Closures for Asphalt Resurfacing
Monday – Friday, 7pm to 6am
SR 26/HWY 80 Chatham County
From Bourne Ave to Wilkes Street
EB and WB Daily/Nightly Lane Closures for Resurfacing
9pm to 6am
SR 196/SR 119 Liberty County
From Gate 1 to Gate 5
MP 0.0 to 3.51 SR 196
Nightly Lane Closures for Milling and Resurfacing
7pm to 5am Friday – 2/10/23 – 02/17/2023
SR 27 Wayne County
East Railroad St to the Glynn County Line
MP 7.33 to MP 35.41
Daily/Nightly Lane Closures for Resurfacing
4/20/22 – 3/10/23
SR 38 Wayne County
CW Collins St (Screven) to SR 203
MP 2.38 to MP 8.98
Daily/Nightly Lane Closures for Resurfacing
12/8/22 – 3/31/23
SR 25 Connector (Gloucester St.) Glynn County
SR 27 to SR 25
MP 7.33 to MP 35.41
Nightly Lane Closures for Resurfacing
7pm to 6am
9/12/22 – 2/28/23
SR 21 Business 21 / Leola Road Screven County
MP 16.58 to MP 0
Daily Lane Closure & Flagging Operation
Mill & Resurfacing
7am to 7pm
1/9/2023 – 2/28/2023
Old Highway 250 Tattnall County
Mainline Left / Right Lane Closed due to Shoulder Widening
Monday – Saturday 7am – 8pm
Starting 2/20/2023 – 9/30/2023
Other Traffic Interruptions
SR 19 Jeff Davis County
North Williams St (MP 12.13) to Pine St. (MP 12.46)
Lane closures Next weekend
9 p.m. Friday 17th till Sunday 19th
To repair concrete pavement
SR23/SR57 Tattnall County
SR169 to SR121
Daily Lane Closures for Road Widening
8am – 3pm
Starting 12/20/22 – 12/10/23
SR 21/SR 30 Chatham County
I-95/SR 405 to Berrien Rd
Nightly Lane Closures for Earth Work on Shoulders and Median
Starting 7pm-6am
Monday – Friday
SR 40 Camden County
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday thru Friday, 7am to 5pm
Ends 9/30/2023
SR 21 MP 6.6 to MP 27.7 Effingham County
Installation of Cable Barrier
Lane Closures Mon. – Fri. 9am-3:30pm & 7pm-6am
Daily/Nightly Lane Closures Saturday and Sunday
3/31/22 – 4/30/23
SR 25/Burnsed Blvd. Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm
- Burnsed Boulevard reduced to two lanes from Hwy 80 through the intersection of SR 25. Traffic will move to the southbound lanes, which will become one lane in each direction.
- SR25 North from Bay Street closed to through traffic. Only trucks needing access to Foundation Drive.