Georgia Department of Transportation continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, August 12 through Friday, August 18.
All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.
Traffic interruptions are listed below by interstates, categories, and counties.
Interstate 95
I-95
Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0)
Lane Closures Monday- Thursday 7pm-7am &
Weekends – Friday 9pm until Monday 5am
Bridge Maintenance/Rehabilitation thru October 2023
I-95 at MP 1.5 – MP 25.5 Camden County
Installation of Cable Barrier
Inside Shoulder Closures Daily
Interstate 16
I-16 (in the Vicinity of SR 307) Chatham County
Lane Closures for DDI Construction on I-16 & SR 307
Monday – Saturday
· I-16 Eastbound from 9 a.m. to 4 p.m.
· I-16 Westbound from 8 a.m. to 3 p.m.
· SR 307 North from 9 a.m. to 4 p.m.
· SR 307 South from 8 a.m. to 3 p.m.
Continues thru end of June 2023
Bridge & Road Closures with Detours
SR 169 at Canoochee River Bridge Evans County
Road Closure June 12 for Bridge Replacement
Expected to Reopen March 2024
Detour via US 301, US 280, SR 129
SR 520 at Satilla River Overflow Bridge Brantley County
Lane Closures for Bridge Replacement
Expected to Reopen July 2024
Single Lane Traffic in Both Directions thru Work Zone
On-site Detour: WB Traffic Shift to EB Bridge
Bridge Construction, Rehabilitation, and Maintenance
State Route 25
Appleby Road (MP 19) to the South Carolina State Line
Alternating Lane Closures for Bridge Construction
Monday – Saturday 9am to 4pm
SR 25 at Houlihan Bridge Chatham County
Single Lane Closure Utilizing Traffic Signals
Bridge Repair Timeline TBD
Alternate Route via SR 25, SR 30, SR 21, I-95, US 17
Resurfacing
SR 204/ Abercorn St
From Georgetown Exit to Stephenson Ave
Lane Closures for Asphalt Resurfacing
Sunday – Friday 7pm to 6am
SR 26/HWY 80
From Bourne Ave to Wilkes Street
Daily/Nightly Lane Closures 9pm to 6am
SR 196/SR 119 Liberty County
From Gate 1 to Gate 5 (MP 4.67 to 7.15)
Lane Closures Friday – Saturday 7pm to 5am
SR 119 Liberty County
From Airport Rd to SR 138 (MP.0 to 4.67)
Lane Closures Friday – Saturday 7pm to 5am
SR 38/ Old Sunbury Road Lib
From Joseph Martin Rd to Old Hines Rd
Nightly Lane Closures for Pipe Installation
Sunday – Friday 7pm to 6am
SR 30
Tattnall/Evans County Line to Cedar St.
Daily Lane Closures 7am to 7pm
4/24/23 – 8/15/23
SR 67 Bypass Bulloch County
Fair Road to SR 26/US 80
Daily Lane Closures 7am to 8pm
Resurfacing 3/20/2023 – 8/15/2023
SR 130
From SR 135 to US 1/SR 4
Daily Lane Closures 7am to 7pm
4/3/2023 – 8/31/2023
SR 303
From SR 520 to SR 25
Daily Lane Closures 7pm to 6am
4/16/2023 – 8/31/2023
SR 25
From Florida Line to MLK Blvd (Kingsland)
Daily Lane Closures
Nightly Lane Closures within City Limits 7pm to 5am
5/5/2023 – 12/31/2023
SR 21
North of Dewitt Rd to Screven Co. Line
Milling & Resurfacing
Daily Flagging Operation (Detour, Lane Shift)
Monday – Sunday 7am – 8pm
Starting 6/5/2023 – 8/30/2023
SR 21 BU
SR 21 to SR 119
Milling & Resurfacing Daily Flagging Operations
Monday – Sunday 7pm to 6am
Starting 7/20/2023 – 8/31/2023
SR 30/US 280 Mon
From SR 135 (Higgston) to SR 4/US 1 (Lyons)
Nightly Lane Closures Sunday – Thursday 6:30pm to 6:30am
8/13/2023 – 12/10/2023
SR 203
From Bacon County Line to Wayne County Line
Daily Lane Closures 7am to 6pm
7/10/2023 – 2/29/2024
SR 25/ US 17
From Sidney Lanier Bridge to SR 25 Spur
Nightly Lane Closures 7pm to 6am
7/18/2023 – 10/31/2023
Other Traffic Interruptions
US 280/SR30 near I-16 Bryan County
Temporary Portable Traffic Signals Activation
At Hyundai Construction Entrance
Thursday, August 17 mid-day
SR 169
From SR 129 to Riverside Drive
Brewton Park Boat Ramp Access will Remain Open to Public
SR 23/SR 57
From SR 169 to SR 121
Daily Lane Closures for Shoulder Building and Grassing
8am to 3pm
Starting 12/20/2022 – 8/31/2023
SR 21/SR 30 Chatham County
I-95/SR 405 to Berrien Rd
Nightly Lane Closures for Work on Striping
Monday – Friday 7pm to 6am
SR 40
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday – Friday 7am to 5pm
Ends 9/30/2023
SR 25/Burnsed Blvd. Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm
- Burnsed Boulevard reduced to two lanes from Hwy 80 through the intersection of SR 25. Traffic will move to the southbound lanes, which will become one lane in each direction.
- SR25 North from Bay Street closed to through traffic. Only trucks needing access to Foundation Drive.
SR 25
Yacht Road to Harry Driggers Blvd
Lane Closures for Widening and Reconstruction
Monday – Friday, 9am to 4pm and 6pm to 7am
Expected Completion 2nd Quarter 2024