Connect with us

Bulloch Public Safety

GDOT: Traffic Impacts for the I-16 at I-95 Improvement Projects Through August 19

FYI for those traveling to and from Chatham

Pro Roof GA

Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen I-16 and reconstruct the I-16/I-95 Interchange. The lane closures are necessary for widening activities for I-16 and bridge work at the I-16/I-516 Interchange.

The Button - donate today!

NOTE: Detour information is shown in red text.


Daytime Closures

Monday, August 14, through Saturday, August 19, 8 a.m. to 3 p.m.
Intermittent right and left lane closures at the following locations

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Monday, August 14, through Saturday, August 19, 9 a.m. to 4 p.m.
Intermittent right and left lane closures at the following locations

  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

 Monday, August 14, through Saturday, August 19, 8 a.m. to 5 p.m.
Intermittent right and left lane closures at the following locations

  • I-516 westbound at the I-16 Interchange from MP 5 to MP 6
  • I-516 eastbound at the I-16 Interchange from MP 6 to MP 5

Overnight Closures

Monday, August 14, through Saturday, August 19, 7 p.m. to 6 a.m.
Intermittent right and left lane closures at the following locations

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

Monday, August 14, through Saturday, August 19, 9 p.m. to 5 a.m.
Double lane closures at the following locations

  • I-95 northbound @ I-16 overpass (MP 98 to MP 100)
  • I-95 southbound @ I-16 overpass (MP 101 to MP 98)

Advance Notice & Detours

Monday, August 14, through Saturday, August 19, 10 p.m. to 5 a.m.

  • I-16 eastbound to I-516 westbound ramp (Exit 164B) (Map)

Motorists traveling on I-16 eastbound should take the I-516 eastbound ramp (Exit 164A), then exit at US 17/US 80/Ogeechee Road (Exit 3), turn left off the ramp, then turn left to access I-516 westbound.


 Long-Term Closure

June 26, 2022, through May 31, 2024

  • Tremont Road under I-16 (Map)

Note: Tremont Road will be open during holiday work restriction time frames.

  • Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4)
  • Motorists traveling on Tremont Road south of I-16 should take I-516 westbound to West Gwinnett Street (Exit 6), turn left on West Gwinnett Street, then left on Telfair Road to access Tremont Road north of I-16

Advisory: Exact time may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

 

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *