Connect with us

Bulloch Public Safety

SE Ga Road Work: Weekly Traffic Interruption Advisory September 18 – 24

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, September 18 through Friday, September 24.

The Button - donate today!

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.

Interstate 16 Interruptions

Bulloch, Bryan, Effingham and Chatham Counties

SR67 to I-95                  

Lane closures for pavement markings

Saturday, September 18 and Friday September 24

From Milepost 126 to 142, 6am to 7pm & 7pm to 6am

 

I-16 Exits 143, 137, 132, 127, 152 

Ramp closure for pavement markings

Nightly 7p.m. until 6a.m. (one ramp closure at a time)(September 25)

Fully signed detours installed nightly

Detour: proceed to next exit, cross over interchange,

opposite direction on I-16, for interchange access

 

 

Interstate 516 Interruptions

Chatham County

I-516 WB Exit 4 On Ramp                                              

Ramp Closure for Concrete Slab Replacement

Beginning Friday, Sept. 17 at 8 pm through 5:30 am Monday, Sept. 20

Detour:  Exit 4 Detour use Tremont Ave to US 17/ Ogeechee Road Traffic will access 516 using exit 3 on ramp

 

 

Bridge & Road Closures with Detours

Bryan County

Olive Branch Road (CR 12) over I-16                           

Road closure for bridge raising and rehabilitation

Expected reopening late September 2021

Detour Route: US 280, US 80

 

Screven County

Beaverdam Creek @ Hilltonia-Perkins RD                  

Road Closure for the bridge replacement project

Expected reopening: December 2021

Detour Route Waynesboro Hwy (Hwy 24), Bascom Rd

 

Charlton County 

Paxton Rd between Dixie Lake Rd & Marshall Crews Rd   

Road Closure for bridge replacement project

Expected reopening:  December 2021

Detour Route via Dixie Lake Rd and Altman Rd.

 

Clinch County

SR 168/122  @ Camp Creek                                          

Road closure for bridge replacement project

Expected reopening December 2021

Detour route via SR 168, SR 37 and US 221

 

 

Bridge Construction, Rehabilitation, and Maintenance

Chatham County

Islands Expressway                                                       

From Elba Island Rd to Oatland Island Rd

East & West single lane traffic flow on a single bridge

Continuous until further notice

 

Appling-Toombs Co.

SR4/US1 Over Altamaha River                                      

West River Rd. (Appling Co.) to Bob Cato Rd. (Toombs Co.)

Daily Lane Closures for Bridge Construction Activities

Monday thru Friday, from 8:00am to 6:00pm  (8-26-21 to 12-31-21)

 

Wayne County

SR169 at Goose Creek Bridge                                      

From Milepost 3 to Milepost 4 

Daily Lane Closures for Bridge Construction Activities

Monday thru Friday; 7am to 5pm  (6-28-21 to 2-8-22)

 

 

Resurfacing 

Chatham County

SR 25/US17                                                                     

Ogeechee River Bridge to I-516 Overpass  

NB & SB Lane Closures for Paving Corrective Work

7pm to 6am, nightly until Saturday, September 25

 

Chatham County

SR 17 (Jimmy Deloach Parkway)                                 

From Prescott Road to SR 21 Overpass

NB & SB Lane Closures for Asphalt resurfacing

Nightly 7pm to 6am until on or near September 30

 

Screven County

SR 73                                                                                

Paving complete.  Striping taking place. No lane closures.

 

Glynn County

SR 32                                                                               

SR 27 (Sterling) to Brantley Co. Line

Lane closures for milling and paving operations

Monday thru Friday, 7am to 6pm, until 11/30/2021

 

Glynn County  

SR 25                                                                               

SR 303 to South of Sidney Lanier Bridge

Lane closures for milling and paving operations

MP 4 (Royal Drive) to MP 8.99 (End of Project)

Monday thru Friday; 8:30am to 6pm until Sept. 30

 

Evans County 

SR 301                                                                             

Tattnall Co Line to MM 7 

Daily Lane closures for milling and paving operations

Time restrictions in and during  school zone hours

Start Date 8/13/2021 To 11/11/2021

 

Toombs County

SR 30                                                                                

Weekend lane closures between MP 3 to MP 8

Concrete replacement at several intersections

 

Clinch County

SR 38                                                                               

Resurfacing from MP 0 to MP 4

Daily lane closures

 

Clinch County

SR 168                                                                             

Surface treatment between MP 6 to 7

Daily lane closures for asphalt overlay

 

 

Other Traffic Interruptions

Effingham County

SR 17 @ Blue Jay Rd roundabout                                 

Road Open as a 4 way stop.

Lane Closures to Install Curb, Gutter, & Sidewalk

9am to 4:30pm, daily until on or near Sept. 30

Detour route Closed 9/24/2021 to 9/272021

 

Camden County

SR 40                                                                               

Beginning West of Grove Point Blvd and extending

East to Truss Plant Road

Daily Lane Closures for drainage structure installation

Beginning at Joyce Court and extending to Seaparc Circle;

7 am to 5 pm, Monday thru Friday until October 8

 

Tattnall County

US 301/US 25/SR 23 AT 196                                          

Beginning South of Baxter Durrance RD and extending

North of Mile Field RD

Daily Lane Closures for construction of roundabout

Monday thru Friday (August 04, 2021 to January 31, 2022);

8am to 5pm

 

Toombs County

US 1/SR 4                                                                        

George Hill Road extending north to MP 9

Daily Lane Closures for Drainage Construction

Monday thru Friday (September 20 thru 25)

8:30 am to 2:30 pm & 4 pm – 6 pm

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *