Connect with us

Bulloch Public Safety

GDOT: Traffic Impacts for the I-16 at I-95 Improvement Projects Through March 14

Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen Interstate 16 (I-16) and reconstruct the I-16/I-95 Interchange. The lane closures are necessary for widening activities for I-16 and bridge work at the I-16/I-516 Interchange.

The Button - donate today!

NOTE: Detour information is shown in red text.


 Daytime Closures

Monday, March 11, through Thursday, March 14, 8 a.m. to 3 p.m.
Intermittent right and left lane closures at the following locations

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Monday, March 11, through Thursday, March 14, 9 a.m. to 4 p.m.
Intermittent right and left lane closures at the following locations

  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

Monday, March 11, through Thursday, March 14, 8 a.m. to 5 p.m.
Intermittent right and left lane closures at the following locations

  • I-516 westbound at the I-16 Interchange from MP 5 to MP 6
  • I-516 eastbound at the I-16 Interchange from MP 6 to MP 5

Nighttime Closures

Monday, March 11, through Thursday, March 14, 7 p.m. to 6 a.m.
Thursday, March 14, through Friday, March 15, 7 p.m. to 5 a.m.
Intermittent right and left lane closures at the following locations

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

Monday, March 11, through Friday, March 15, 9 p.m. to 5 a.m.
Double lane closures at the following locations

  • I-95 northbound @ I-16 overpass (MP 98 to MP 100)
  • I-95 southbound @ I-16 overpass (MP 101 to MP 98)

ADVANCE NOTICE & DETOURS
Monday, March 11, through Friday, March 15, 10 p.m. to 5 a.m. (Nightly)

  • I-95 southbound to I-16 westbound ramp (Exit 99) (Map)

Motorists traveling on I-95 southbound should continue past the I-16/I-95 Interchange, exit at SR 204 (Exit 94) turn left off the ramp, then turn left to access I-95 northbound, then take the I-16 westbound ramp (Exit 99B).
 
Sunday, March 10, through Friday, March 15, 10 p.m. to 5 a.m. (Nightly)

  • I-16 westbound to I-95 northbound ramp (Exit 157) (Map)

Motorists traveling on I-16 westbound take the exit for I-95 southbound (Exit 157), exit at SR 204 (Exit 94) turn left off the ramp, then turn left to access I-95 northbound.


LONG-TERM CLOSURE
 
June 26, 2022, through May 31, 2024
Tremont Road under I-16 (Map)

  • Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4)
  • Motorists traveling on Tremont Road south of I-16 should take I-516 westbound to West Gwinnett Street (Exit 6), turn left on West Gwinnett Street, then left on Telfair Road to access Tremont Road north of I-16

St. Patrick’s Day holiday work restrictions will be in place from Friday, March 15, 2024, at 5 a.m. to Monday, March 18, 2024, at 10 p.m. No road closures or work that restricts or interferes with traffic will be conducted during this time frame.


Advisory: Exact time may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *