Connect with us

Bulloch Public Safety

SE Ga Road Work: Weekly Traffic Interruption Advisory Through December 22

Georgia Department of Transportation continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, December 16 through Friday, December 22.

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.

Interstate 16                            

I-16 (in the Vicinity of SR 307)                 Chatham County            
Lane Closures for DDI Construction on I-16 & SR 307
Monday – Saturday
· I-16 Eastbound from 9 a.m. to 4 p.m.
· I-16 Westbound from 8 a.m. to 3 p.m.
· SR 307 North from 9 a.m. to 4 p.m.
· SR 307 South from 8 a.m. to 3 p.m.
Continues thru end of 2023

I-16 West                                                     Bulloch County
Shoulder Closed due to Installing Conduit on R/W Lane Shift
Beginning @ MM117 Westbound. Ending @ MM118
Daily 7zm – 8pm
Starting 12/15/2023 – 6/30/2024

I-16 East                                                       Bryan County
Shoulder Closed due to Installing Conduit on R/W Lane Shift
Beginning @ MM 142 Eastbound. Ending @ MM 143
Daily 7am –8pm
Starting 12/15/2023 – 6/30/2023

I-16 West                                                      Bryan County
Shoulder Closed due to Installing Conduit on R/W Lane Shift
Westbound from MM 143 to MM 144
Daily 7am – 8pm
Starting 12/15/2023 – 6/30/2023

I-16 West                                                       Laurens County
Shoulder Closed Lane Shifting
Westbound from MM 53 to MM 55
Daily 7am – 8pm
Starting 12/18/2023 – 6/30/2023

Bridge & Road Closures with Detours

SR 169 at Canoochee River Bridge            Evans County
Road Closure June 12 for Bridge Replacement
Expected to Reopen March 2024
Detour via US 301, US 280, SR 129

SR 520 at Satilla River Overflow Bridge    Brantley County 
Lane Closures for Bridge Replacement
Expected to Reopen July 2024
Single Lane Traffic in Both Directions thru Work Zone
On-site Detour: WB Traffic Shift to EB Bridge

Harden Chapel Rd                                        Toombs County
Road Closure for Bridge Replacement
From 10/4/23 – 3/31/24
Detour via SR 56, US 1

Birdford Lake Rd                                           Tattnall County
Road Closure for Bridge Replacement
From 11/27/23 – 6/24/24
Detour via US 301, SR 144, John M. Brewton Rd

Bridge Construction, Rehabilitation, and Maintenance

SR 25 at Houlihan Bridge                              Chatham County 
Single Lane Closure Utilizing Traffic Signals
Bridge Repair Timeline TBD
Alternate Route via SR 25, SR 30, SR 21, I-95, US 17

Resurfacing

SR 38 US 84 Offerman to Screven               Pierce/Wayne County
From MP 17.74 (in Offerman) to MP 1.01 (in Wayne Co)
Lane Closures for Asphalt Resurfacing
Daily 7am to 7pm Nov.1 thru Dec. 31, 2023

SR 204/Abercorn St                                       Chatham County
From Georgetown Exit to Stephenson Ave
Lane Closures for Asphalt Resurfacing
Sunday – Friday 7pm to 6am

SR 26/Victory Drive                                        Chatham County
From Bee Road to Ogeechee Rd (MP 19.81 to MP 17.22)
Single Lane Closure Milling/Repaving
Daily/Nightly Lane Closures
Monday – Friday 8am to 4pm
Saturday – Sunday 7am to 7pm

SR 196/SR 119                                                 Liberty County
From Gate 1 to Gate 5 (MP 4.67 to 7.15)
Lane Closures Friday – Saturday 7pm to 5am

SR 38/Old Sunbury Road                               Liberty County
From Joseph Martin Rd to Old Hines Rd
Nightly Lane Closures for Pipe Installation
Sunday – Friday 7pm to 6am

SR 303                                                              Glynn County
From SR 520 to SR 25
Daytime Lane Closures (Saturdays Only)
11/18/2023 – 12/31/23

SR 21 BU                                                           Effingham County
SR 21 to SR 119
Milling & Resurfacing Daily Flagging Operations
Monday – Sunday 7pm to 6am

SR 30/US 280                              Montgomery/Toombs Counties
From SR 135 (Higgston) to SR 4/US 1 (Lyons)
Nightly Lane Closures Sunday – Thursday 6:30pm to 6:30am
8/13/2023 – 4/30/2024

SR 203                                                               Appling County
From Bacon County Line to Wayne County Line
Daily Lane Closures 7am to 6pm
7/10/2023 – 2/29/2024

SR 25/US 17                                                      Glynn County
From Sidney Lanier Bridge to SR 25 Spur
Nightly Lane Closures 7pm to 6am
7/18/2023 – 12/31/2023

SR 25 Spur / F.J. Torras Causeway (SSI)        Glynn County
Nightly Lane Closures 7pm to 6am
7/16/2023 – 8/15/2023

SR 25/US 17                                                       McIntosh County
From SR 251 to Newport River Bridge
Daily Lane Closures with Flagging Operation
10/11/2023 – 12/31/2023

Other Traffic Interruptions

SR 169                                                                Evans County
From SR 129 to Riverside Drive
Brewton Park Boat Ramp Access will Remain Open to Public

Harville Rd at Langston Chapel Rd                 Bulloch County
Harville Road (CR 585) at Langston Chapel Road (CR 248)
Roundabout Construction
Lane Closures for Utility Work
Monday – Thursday 9am to 4:30pm
Friday – Sunday 9am to 3:30pm
11/27/23 – 12/21/23

SR 21/SR 30                                                         Chatham County
I-95/SR 405 to Berrien Rd                            
Nightly Lane Closures for Work on Striping
Monday – Friday 7pm to 6am

SR 40                                                                    Camden County
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday – Friday 7am to 5pm
Ends 12/31/2023

SR 25/Burnsed Blvd.                                           Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm

  • Burnsed Boulevard reduced to two lanes from Hwy 80 through the intersection of SR 25. Traffic will move to the southbound lanes, which will become one lane in each direction.
  • SR25 North from Bay Street closed to through traffic. Only trucks needing access to Foundation Drive.

SR 25                                                                       Glynn County
Yacht Road to Harry Driggers Blvd
Daily Lane Closures with Flagging Operation
Monday – Friday, 9am to 4pm and 6pm to 7am
Expected Completion 2nd Quarter 2024

US 17/SR 25 AT SR 99                                           Glynn County
Roundabout Construction on US 17/SR 25 at SR 99
Daily Lane Closures with Flagging Operation
11/1/23 – 11/30/24

SR 303                                                                     Glynn County
Quick Response Project Turn Lane Extension
Daily Lane Closures 9am-3:30pm & 6pm-7am
11/6/2023 – 12/31/2023

US 84/SR 38                                                            Wayne County
Jesup Intersection Improvements at Orange, Cherry,
and Pine Street Intersections
Daily Lane Closures 11/16/2023 – 2/28/2024

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *