Connect with us

Bulloch Public Safety

GDOT: Interstate Lane Closure for the I-16 at I-95 Improvement Projects Through September 10

FYI for those traveling to and from Chatham

Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen I-16 and reconstruct the I-16/I-95 Interchange. The lane closures are necessary for widening activities for I-16 and bridge work at the I-16/I-516 Interchange.

NOTE: Detour information is shown in red text.


Daytime Closures

Tuesday, September 6, through Saturday, September 10, 8 a.m. to 3 p.m.
Intermittent right and left lane closures at the following locations

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Tuesday, September 6, through Saturday, September 10, 9 a.m. to 4 p.m.
Intermittent right and left lane closures at the following locations

  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

Tuesday, September 6, through Saturday, September 10, 8 a.m. to 5 p.m.
Intermittent right and left lane closures at the following locations

  • I-516 westbound at the I-16 Interchange from MP 5 to MP 6
  • I-516 eastbound at the I-16 Interchange from MP 6 to MP 5

Overnight Closures

Tuesday, September 6, through Saturday, September 10, 7 p.m. to 6 a.m.
Intermittent right and left lane closures at the following locations

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

Tuesday, September 6, through Saturday, September 10, 9 p.m. to 5 a.m.
Double lane closures at the following locations

  • I-95 northbound @ I-16 overpass (MP 98 to MP 100)
  • I-95 southbound @ I-16 overpass (MP 101 to MP 98)

Overnight Closure and Detour

Tuesday, September 6, through Saturday, September 10, 8 p.m. to 6 a.m. (Nightly) 

  • I-16 eastbound to I-516 westbound ramp (Exit 164B) 

Motorists traveling on I-16 eastbound should take the I-516 eastbound ramp (Exit 164A), then exit at US 17/US 80/Ogeechee Road (Exit 3), turn left off the ramp, then turn left to access I-516 westbound.


Long-Term Closure

June 2, 2022, through May 31, 2023

  • Tremont Road under I-16 

Note: Tremont Road will be open during holiday work restriction time frames.

  • Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4).
  • Motorists traveling on Tremont Road south of I-16 should take I-516 westbound to West Gwinnett Street (Exit 6), turn left on West Gwinnett Street, then left on Telfair Road to access Tremont Road north of I-16.


 

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *