Georgia DOT continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, July 30 through Friday, August 5.
All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.
Traffic interruptions are listed below by interstates, categories, and counties.
Interstate 95
McIntosh County
I-95
Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0)
Lane Closures for Bridge Maintenance/Rehabilitation
Mon.- Thurs. 7pm-7am
Weekends-9pm Fri. until 5am, Mon.
Thru November 2022
McIntosh County
I-95 South Milepost 45-46
Lane and shoulder closure
Fri. & Sat., August 5 & 6
Permitted shoulder work
Interstate 516
Chatham County
From Mildred St. to Railroad Bridge (MP 6.68)
Shoulder Paving and Grinding Operations
Nightly Lane Closures Friday 7/29 – 8/05
EB Exit 7 Off Ramp Closure/Detour for Asphalt Shoulder Paving 7/29-7/30
EB Exit 3 On/Off Ramp Closure/Detour for Asphalt Shoulder Paving Sunday 7/31
WB Exit 4 On Ramp Closure/Detour for Asphalt Shoulder Paving Sunday 7/31
Operations Beginning at 7pm Friday 7/29 to 5am Monday 8/01
Follow Detour Signs Along Route
Bridge & Road Closures with Detours
Screven County
Ogeechee Creek @ Ogeechee Rd
Road Closure for Bridge Replacement
Expected Reopens early-September
Detour via Goloid Church Rd., US 301 East, Goloid Church Rd. West
Brantley County
US 82
Westbound (WB) Bridge Replacement Project
3 Miles West of Hoboken @ Big Creek-Onsite Detour
New WB Bridge Scheduled to Open in Early 2023
Single Lane Traffic in Both Directions thru Work Zone
Detour: WB Traffic Shift to EB bridge
Wayne County
Reedy Creek @ Stanfield Rd
Road Closure for Bridge Replacement
Expected Reopens January 2023.
7/18/22 – 7/31/22 open to agriculture traffic only.
8/1/22 closed to all traffic.
Detour via Michael Mikell Lake Rd., Tyre Bridge Rd., US 84.
Camden County
- Howard Street
Road Closure for Construction on SR 40
Starting July 25, 2022. Expected Reopens August 25, 2022
Detour via Grove Blvd., SR 40
Piney Grove Rd at Colemans Creek Appling County
Road Closure for Bridge Replacement
Starting June 20, 2022. Expected to Reopen December 31, 2022
Detour Via SR 203/SR 121/SR 15
Bridge Construction, Rehabilitation, and Maintenance
Appling-Toombs Co.
SR 4/US 1 Over Altamaha River
West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.)
Daily Lane Closures for Bridge Construction Activities
Monday thru Friday, 7am to 6pm (Completion Dec.)
Resurfacing
Chatham County
SR 204/Fort Argyle Rd.
From Old River Rd to Gateway Blvd
Lane Closures for Asphalt Resurfacing
7pm to 6am, 8/01 to 8/06 (8/31/2022)
Chatham County
SR 307/Dean Forest Rd.
From SR 21 To US 80
Lane Closure for Traffic Signal Work
6pm to 7am, 7/29 to 8/05
Chatham County
SR 307/Dean Forest Rd.
From I-16 to Hwy 80
Daily/Nightly Lane Closures for Resurfacing
6pm to 7am Tuesday 7/29 – Friday 8/05
Wayne County
SR 27
East Railroad St to the Glynn County Line
MP 7.33 to MP 35.41
Daily/Nightly Lane Closures for Resurfacing
4/20/22 – 8/31/22
Tattnall County
SR 73
North of SR 144 to the Evans Co. Line
Lane Closures for Installing Final Striping
Daily Lane Closures 7am – 8pm
Starting 7/30/2022 – 8/15/2022
Ware County
SR 520
Atkinson Co Line MP .0 to Anita St. MP 19.6
Daily Lane Closures for Resurfacing
7am to 8pm
Starting 6/21/22 to 10/31/22
Toombs County
SR 56
Paul Lockley Rd to Underwood Rd
Daily Lane Closures for Resurfacing
6:30am to 7pm
Starting 7/28/22 to 8/31/2022
Other Traffic Interruptions
Chatham County
SR25 NB at I-516 WB On-Ramp
From Blossom Drive to Millis Lane (MP 10.61)
Turn Lane Extension at WB I-516 On-Ramp
Daily Lane Closures 9am – 3pm 7/29- Friday 8/05 (08/24/2022)
Telfair County
SR 132
Between Murry Ln and McRae Milan Rd (MP 15.00 to 19.00)
Daily lane closures to repair cross drain pipes
Chatham County
SR 21/SR 30
I-95/SR 405 to Berrien Rd
Nightly Lane Closures for Earth Work on Shoulders and Median
Starting 7pm-6am Friday 07/29/22- 8/05/22 (8/26/2022)
Camden County
SR 40
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday thru Friday, 7am to 5pm
Ends 11/30/2022
Effingham County
SR 21
MP 6.6 to MP 27.7
Lane Closures for Installation of Cable Barrier
Daily Lane Closures Starting 9am-3:30pm and 7pm-6am, Mon.–Fri.
Daily/Nightly Lane Closures Saturday and Sunday
3/31/22 – 8/31/22