Connect with us

Bulloch Public Safety

SE Ga Road Work: Weekly Traffic Interruption Advisory Through August 29

Georgia Department of Transportation continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, August 23 through Friday, August 29.

All work is subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.

Interstate 95

 I-95 North at FL State Line                                  Camden County 
St. Marys River Bridge (FDOT) Repairs
Overnight Lane Closures in FL & GA

I-95 South at Exit 87/US 17                                   Bryan County
Overnight Lane Closures Aug. 4 Preparing for Shift
All Lane Traffic Shifts in Place
Aug. 15-18 Traffic Shift Reduced to 2 Lanes with Single Lane Closure
Bridge Maintenance Work

I-95 SB & NB at MP 90 – 91                                   Chatham County 
Northbound & Southbound Left Lane Closure
Pouring Concrete Footer for Signs
Nightly Single Lane Closure

I-95 SB & NB at MP 85 – 112                      Bryan/Chatham County
North & Southbound Outside Lane Closures
Concrete Work for Sign Improvements
Nightly Sunday – Saturday 7pm – 7am

I-95 NB/ SR 405 Ogeechee River MP 90 – 92.5  Chatham County 
Northbound & Southbound Lane Closure
Bridge Maintenance Rehabilitation
Nightly Single Lane Closure Monday – Sunday 9pm – 6am
Continuous Shoulder Closures – Currently on I-95 Southbound
August 20, 2025 – August 27, 2025

I-95 Bridge at SR 25/Hwy 17                                Bryan County
NB Right Lane & Shoulder Closing
Nightly Lane Closures 9pm – 5am

I-95 SB & NB, MP 27- 36                                       Glynn County 
Northbound & Southbound Lane Closures
Resurfacing
Nightly Lane Closures 7pm – 6am
Thru Jan. 2026

I-95 North & South MP 91 – MP 92.2                   Chatham County
Nightly Lane Closures
Roadway Maintenance
Thru Oct. 2025

Interstate 16 

I-16 EB & WB Under Chatham Parkway Bridge Chatham County
MP 163.5 – 161.5
Daily Single Lane Closures

Chatham Parkway Bridge Over I-16                    Chatham County
MP 47.42 – 47.72
Daily/Nightly Lane Closures (Nightly Closures Only Once School Starts Back)
Working on Corrective Items and the Polymer Overlay
7/25/2025 – 8/31/2025

Interstate 516 

I–516 EB & WB at MP 6 to MP 4                           Chatham County
From Louisville Rd to Tremont Rd                            
Bridge Maintenance on I-516
Continuous Nightly Lane Closures/Weekend
Monday – Sunday 9pm – 5am
5/10/2025 – 8/31/2025

Bridge & Road Closures with Detours

Lewis Frasier Rd @ Peacock Creek                    Liberty County
Lewis Frasier Rd to Bill Carter/Dave Williams Rd
150-Day Road Closure for Bridge Replacement
Detour via Lewis Frasier Rd., US 17 and US 84

Bridge Construction, Rehabilitation, and Maintenance

SR 25/US17 @ Cypress Mill Creek                      Glynn County
Bridge Rehab
Between 4th St and SR 25 Spur/Golden Isles Pkwy
NBL, Nightly Lane Closures 7pm – 6am
Expected Completion 4th Quarter 2025

SR 46 Little Lotts Creek Bridge                           Bulloch County
Daily Flagging operation on 2 lane road for bridge maintenance between MP 8-9(Kruse Road to Sinkhole Road)
Monday-Saturday 7am – 5pm
Beginning August 25, 2025 to September 12, 2025

SR 204 @ Forest River                                         Chatham County  
Bridge Rehab 
EBL/WBL, Nightly Lane Closures 7pm – 6am
EBL/WBL, Continuous Lane Closure 9pm Friday to Monday 5am
Expected Completion 4th Quarter 2025

SR520/US82 @ College Creek                             Glynn County
Bridge Maintenance/Rehab                                                                                              
Nightly Lane Closures 7pm – 6am
Expected Completion 4th Quarter 2025

US 84/SR 38 at Doctors Creek                             Long County
From Maple Road NE to Austin Lane SE (MP.0 to 2.00)
WB Bridge Replacement Project
On-site Detour Begins Thurs., Aug. 8
WB Median Crossover Detour
Signal Lane Traffic in Both Directions on Eastbound Bridge

US 84/SR 38 at Satilla River                     Pierce/Ware Counties
Northside of Bridge Closed to Traffic for Replacement
Single Lane Traffic in Both Directions on Southside of the Bridge

SR 38/US 84 @ Little McMillan Creek                  Wayne County  
Median Crossover Detour with Lane Closure
7/9/25 – 4/3/26

Resurfacing

SR 38/US 84 and Old Sunbury Road                   Liberty County
From Joseph Martin Rd to Old Hines Rd
Daily/Nightly Lane Closures for Installation of Median
Sunday – Friday 7pm – 6am

SR 38/SR 119 (MP 8.23 to MP .20)                       Liberty County
From East Wallace Dr to West of SR 119
Nightly Lane Closures 7pm – 5 am
Sunday – Thursday

SR 38/US 84                                                          Wayne County
Resurfacing
From Sunset Blvd to SR 23
Nightly Lane Closures 7pm – 6am
7/13/25 – 9/30/25

SR 117                                                                   Telfair County
From SR 27/US 341 to Telfair County Line Rd.
Daily Lane Closures for Resurfacing 7am – 7pm
7/7/25 – 12/31/25

SR 122                                                                    Clinch County
From Lanier County Line to the Ware County Line
Daily Lane Closure/Flagging Operation for Asphalt Resurfacing
Monday – Friday 7am – 6pm
7/20/25 – 11/30/25

SR 73/US 301                                                        Bulloch County
From SR 46 to Langston Chapel Road
Daily Lane Closures for Resurfacing
Monday – Saturday 7AM – 7PM
7/22/2025 – 8/25/2025

SR 73/US 301                                                        Bulloch County
From Langston Chapel Road to Tillman Road
Nightly Lane Closures for Resurfacing
Monday – Friday 7pm – 7am
8/25/2025 – 9/30/2025

Other Traffic Interruptions

US 80                                                                      Chatham County
New signalized intersection activation
At Westside Blvd. in the City of Pooler
Activation Tuesday, Aug. 26

SR 24/East Main Street                                        Bulloch County
(All work performed by City of Statesboro)
SR 24/East Main Street at MP 0.25 Prior to Intersection with SR 26/US 80
SR 24/East Main Street Road Closure with Signed Detour for Replacement of Culvert Under East Main Street
Closure with Detour Begins 8/11/25.  Re-opened by 8/29/25

SR 25/Burnsed Blvd                                             Chatham County
US 80/Burnsed Blvd and SR 25/Brampton Rd
Road Widening, Asphalt Leveling & Paving Operations
Daily Lane Closures

US 80/SR 26/Ogeechee Rd                                  Chatham County
From Victory Dr to Tremont Rd (MP 16.27 to MP 18.00)
Utilities Work Needed from Liberty Pkwy to Horizon Pkwy
Daily/Nightly Lane Closures
Road Widening/Paving Operations/Bridge Demolition
Bridge Construction Over CSX Railroad

Lakeview Road                                                     Bulloch County
From Landfill Road to Old River Road
Daily Flagging Operation on 2-Lane County Road for Road Widening and Shoulder Upgrades.
Monday – Friday 7am – 7pm
Beginning August 25, 2025 – September 30, 2025

SR 25                                                                     Glynn County
Yacht Road to Harry Driggers Blvd
Daily Lane Closures with Flagging Operation
Monday – Friday 9am – 4pm and 6pm – 7am
Expected Completion 3rd Quarter 2026

SR 25                                                                     Glynn County
Harry Driggers Blvd to SR 99
Daily Lane Closures with Flagging Operation
Monday – Friday 9am – 4pm and 6pm – 7am
Expected Completion 3rd Quarter 2026

SR 30 at Benton Blvd Roundabout                    Chatham County
Daily Shoulder Closures on Eastbound Shoulders of SR 30 and Roundabout at New Effingham Parkway Intersection
Closure for Installation of Drainage Pipe for Effingham Parkway
Monday – Friday 9am – 4pm

SR 38/ SR119                                             Liberty & Long Counties
Liberty County Bypass Long Co (MM 13.0- Liberty MM 0.6)
Widening & Reconstruction of Freight Route on SR 38 Bypass
Daily Lane Closures
08/18/2025 – 9/30/2025

US 1/SR 4 Bypass Project                                   Toombs County
US 1 Detoured onto US 1 Bypass & Connector
TWO (2) New All Way STOP Intersections
From Green Oak Rd to Scarlett Rd
Starts July 8 until US 1 Bypass Project Completion

SR 25 Spur/Golden Isles Pkwy AT SR 99          Glynn County
Roundabout Construction on SR 25 Spur/Golden Isles Pkwy at SR 99
Daily Lane Closures and Traffic Pacing
8/19/25 – 12/31/25


Advisory: Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.


Georgia Department of Transportation plans, constructs and maintains Georgia’s state and federal highways. We’re involved in bridge, waterway, public transit, rail, general aviation, bike and pedestrian programs. And we help local governments maintain their roads. Georgia DOT and its nearly 4,000 employees are committed to delivering a transportation system focused on innovation, safety, sustainability and mobility. The Department’s vision is to boost Georgia’s competitiveness through leadership in transportation.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *