Connect with us

Bulloch Public Safety

Georgia DOT Announces I-95 Exit 76 ramp closures start Aug. 3

Motorists are advised to find an alternate route or reduce speeds as they travel through this construction work zone.

In conjunction with the resurfacing project of Interstate 95 in Liberty and Bryan Counties, contractors will close one ramp each night at Exit 76 (Midway/Sunbury) starting Saturday, August 3 through Saturday, August 10 from 7 p.m. until 7 a.m.

Pro Roof GA
The Button - donate today!

These overnight ramp closures are required for the contractor to resurface the ramps and gore areas at this interchange. Traffic will be detoured via I-95 South to Exit 67 to access I-95 northbound to US 84 and I-95 North to Exit 87 to access I 95 southbound to US 84/SR 38. All work is weather contingent.

Motorists are advised to find an alternate route or reduce speeds as they travel through this construction work zone. Message signs, barrels and/or cones will be utilized to alert the public of the upcoming changes. Drivers should be aware that personnel and equipment could be operating in close proximity to travel lanes.

For real-time information about statewide road conditions, know before you go. Before getting into your car – call 511 or visit 511ga.org, where you can access statewide, route-specific information on crashes, road work, traffic and weather. Callers can transfer to operators to report incidents or request assistance on interstate or state routes across Georgia. The system can be also be used to access transit providers, major airports, rideshare organizations, tourism information and 511 systems in surrounding states. For information about Georgia DOT, visitwww.dot.ga.gov

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *