Connect with us

Bulloch Public Safety

GDOT: Traffic Impacts for the I-16 at I-95 Improvement Projects Through December 30

FYI for those traveling to and from Chatham

Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen I-16 and reconstruct the I-16/I-95 Interchange. The lane closures are necessary for widening activities for I-16 and bridge work at the I-16/I-516 Interchange.

Pro Roof GA
The Button - donate today!

NOTE: Detour information is shown in red text.


Daytime Closures

Tuesday, December 27, through Friday, December 30, 8 a.m. to 3 p.m.
Intermittent right and left lane closures at the following locations:

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Tuesday, December 27, through Friday, December 30, 9 a.m. to 4 p.m.
Intermittent right and left lane closures at the following locations:

  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

Tuesday, December 27, through Friday, December 30, 8 a.m. to 5 p.m.
Intermittent right and left lane closures at the following locations:

  • I-516 westbound at the I-16 Interchange from MP 5 to MP 6
  • I-516 eastbound at the I-16 Interchange from MP 6 to MP 5

Overnight Closures

Tuesday, December 27, through Thursday, December 29, 7 p.m. to 6 a.m.
Intermittent right and left lane closures at the following locations:

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

Tuesday, December 27, through Thursday, December 29, 9 p.m. to 5 a.m.
Double lane closures at the following locations:

  • I-95 northbound @ I-16 overpass (MP 98 to MP 100)
  • I-95 southbound @ I-16 overpass (MP 101 to MP 98)

Long-Term Closure

LONG-TERM CLOSURE
 
June 2, 2022, through May 31, 2023
 

  • Tremont Road under I-16 (Map)

Note: Tremont Road will be open during holiday work restriction time frames.
• Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4)


Holiday work restrictions will be in place beginning Thursday, December 22, 2022, at 5 a.m. until Monday, December 26, 2022, at 11 p.m. and Saturday, December 31, 2022, at 5 a.m. until Monday, January 2, 2023, at 11 p.m. No lane closures or work that restricts or interferes with traffic will be conducted during this time frame.

Advisory: Exact times may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *