Connect with us

Bulloch Public Safety

GDOT: Interstate Lane Closure & Detour Advisory for the I-16 at I-95 Improvement Projects Through April 30

FYI for those traveling to and from Chatham

Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen I-16 and reconstruct the I-16/I-95 Interchange. The lane and ramp closures are necessary for widening activities for I-16, bridge work on I-95, and bridge work at the I-16/I-516 Interchange.

Pro Roof GA
The Button - donate today!

*NOTES: Detour information is shown using red text.


Daytime Closures

Monday, April 25, through Saturday, April 30, 8 a.m. to 3 p.m. (Daily)
Intermittent right and left lane closures at the following locations
I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Monday, April 25, through Saturday, April 30, 9 a.m. to 4 p.m. (Daily)
Intermittent right and left lane closures at the following locations
I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

Monday, April 25, through Saturday, April 30, 8 a.m. to 5 p.m. (Daily)
Intermittent right and left lane closures at the following locations
I-516 westbound at the I-16 Interchange from MP 5 to MP 6
I-516 eastbound at the I-16 Interchange from MP 6 to MP 5


Overnight Closures

Monday, April 25, through Saturday, April 30, 7 p.m. to 6 a.m. (Nightly)
Intermittent right and left lane closures at the following locations
I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

Monday, April 25, through Saturday, April 30, 9 p.m. to 5 a.m. (Nightly)
Double lane closures at the following locations
I-95 northbound @ I-16 overpass (MP 98 to MP 100)
I-95 southbound @ I-16 overpass (MP 101 to MP 98)


Overnight Closures & Detours

Monday, April 25, through Friday, April 29, 10 p.m. to 5 a.m. (Nightly) 
I-16 eastbound to I-516 westbound ramp (Exit 164B) 
Motorists traveling on I-16 eastbound should take the I-516 eastbound ramp (Exit 164A), then exit at US 17/US 80/Ogeechee Road (Exit 3), turn left off the ramp, then turn left to access I-516 westbound.

 
Wednesday, April 27, 10 p.m. to 5 a.m. (Nightly) 
I-95 southbound to I-16 eastbound ramp (Exit 99A)
Motorists traveling on I-95 southbound should continue past the I-16/ I-95 interchange, exit at SR 204 (Exit 94) turn left off the ramp, then turn left to access I-95 northbound, then take the I-16 eastbound ramp (Exit 99A).

 

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *