Connect with us

Bulloch Public Safety

GDOT: Traffic Impacts for the I-16 at I-95 Improvement Projects Through May 11

Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen Interstate 16 (I-16) and reconstruct the I-16/I-95 Interchange. The lane closures are necessary for widening activities for I-16 and bridge work at the I-16/I-516 Interchange.

NOTE: Detour information is shown in red text.


Daytime Closures

Monday, May 6, through Saturday, May 11, 8 a.m. to 3 p.m. (Daily)
Intermittent right- and left-lane closures at the following locations

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Monday, May 6, through Saturday, May 11, 9 a.m. to 4 p.m. (Daily)
Intermittent right- and left-lane closures at the following locations

  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

Monday, May 6, through Saturday, May 11, 8 a.m. to 5 p.m. (Daily)
Intermittent right- and left-lane closures at the following locations

  • I-516 westbound at the I-16 Interchange from MP 5 to MP 6
  • I-516 eastbound at the I-16 Interchange from MP 6 to MP 5

Nighttime Closures

Friday, May 3, through Saturday, May 11, 9 p.m., to 5 a.m. (Nightly)
Single-lane closures as the following locations

  • Chatham Parkway northbound @ I-16 overpass
  • Chatham Parkway southbound @ I-16 overpass

Monday, May 6, through Saturday, May 11, 7 p.m. to 6 a.m. (Nightly)
Intermittent right- and left-lane closures at the following locations

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

Monday, May 6, through Saturday, May 11, 9 p.m. to 5 a.m. (Nightly)
Double-lane closures at the following locations

  • I-95 northbound @ I-16 overpass (MP 98 to MP 100)
  • I-95 southbound @ I-16 overpass (MP 101 to MP 98)

ADVANCE NOTICE & DETOURS

Note: The following detours will be scheduled so they will not conflict with one another.Closures and detours will be coordinated to ensure proper maintenance of traffic. No more than one ramp in the I-16/I-516 Interchange will be closed at a time.

Monday, May 6, through Saturday, May 11, 8 p.m. to 5 a.m. (Nightly)

  • I-16 eastbound to I-516 westbound ramp (Exit 164B) (Map)

Motorists traveling on I-16 eastbound should take the I-516 eastbound ramp (Exit 164A), then exit at US 17/US 80/Ogeechee Road (Exit 3), turn left off the ramp, then turn left to access I-516 westbound.


LONG-TERM CLOSURE

June 26, 2022, through May 31, 2025
Tremont Road under I-16 (Map)

  • Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4)
  • Motorists traveling on Tremont Road south of I-16 should take I-516 westbound to West Gwinnett Street (Exit 6), turn left on West Gwinnett Street, then left on Telfair Road to access Tremont Road north of I-16

Advisory: Exact time may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *