Connect with us

Bulloch Public Safety

SE Ga Road Work: Weekly Traffic Interruption Advisory October 9 – 15

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, October 9 through Friday, October 15.

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.

Interstate 16 Interruptions

Bulloch, Bryan, Effingham and Chatham Counties

SR67 to I-95                      

Lane closures for pavement markings

Saturday, October 9 and Friday October 15

From Milepost 152 to 155, 7pm to 6am

 

 

Interstate 516 Interruptions

Chatham County

From Mildred St. (MP 0) to Railroad Bridge (MP)6.680         

Single Lane Closures for concrete slab replacement

October 13 to Sunday October 17 from 7 PM to 5 AM, Daily

 

 

Bridge & Road Closures with Detours

Screven County

Beaverdam Creek @ Hilltonia-Perkins RD       

Road Closure for the bridge replacement project

Expected reopening: December 2021

Detour Route Waynesboro Hwy (Hwy 24), Bascom Rd

 

Charlton County 

Paxton Rd between Dixie Lake Rd & Marshall Crews Rd        

Road Closure for bridge replacement project

Expected reopening:  December 2021

Detour Route via Dixie Lake Rd and Altman Rd.

 

Clinch County

SR 168/122  @ Camp Creek                                                          

Road closure for bridge replacement project

Expected reopening December 2021

Detour route via SR 168, SR 37 and US 221

 

 

Bridge Construction, Rehabilitation, and Maintenance

Chatham County

Islands Expressway                                                                     

From Elba Island Rd to Oatland Island Rd

Nightly Flagging operations to set beams

Monday thru Friday from 7pm to 6am October 11- October 16

 

Appling-Toombs Counties

SR4/US1 Over Altamaha River                                                     

West River Rd. (Appling Co.) to Bob Cato Rd. (Toombs Co.)

Daily Lane Closures for Bridge Construction Activities

Monday thru Friday, from 8:00am to 6:00pm  (8-26-21 to 12-31-21)

 

Wayne County

SR169 at Goose Creek Bridge                                                      

From Milepost 3 to Milepost 4 

Daily Lane Closures for Bridge Construction Activities

Monday thru Friday; 7am to 5pm  (6-28-21 to 2-8-22)

 

 

Resurfacing 

Chatham County                 

SR 25/US17                                                                                     

Ogeechee River Bridge to I-516 Overpass  

NB & SB Lane Closures for Paving Corrective Work

Saturday, October 9 to Saturday, October 16, from 7pm to 6am, Daily

 

Chatham County

SR 17 (Jimmy Deloach Parkway)                                                 

From Prescott Road to SR 21 Overpass

NB & SB Lane Closures for Asphalt resurfacing

Saturday to Friday from 7pm to 6am

 

Glynn County

SR 32                                                                                               

SR 27 (Sterling) to Brantley Co. Line

Lane closures for milling and paving operations

Monday thru Friday, 7am to 6pm, until 11/30/2021

 

Glynn County  

SR 25                                                                                                

SR 303 to South of Sidney Lanier Bridge

Lane closures for milling and paving operations

 

Royal Drive to Sidney Lanier bridge

Monday thru Friday; 8:30am to 6pm until 10/15//2021

SR 303 to Royal Drive

Sunday thru Friday; 6pm to 7am until 10/15/2021

 

Evans County 

SR 301                                                                                              

SR 301 Tattnall Co Line to MM 7 

Daily Lane closures for milling and paving operations

Work time restrictions when in the School Zone

Start Date 8/13/2021 To 11/11/2021

 

Bryan County

SR 30                                                                                                

From I-16/ SR 404 (WB Ramps) and South Industrial Blvd

Mill and Inlay of existing asphalt

Nightly Lane Closures / Flagging Operation

Sunday – Saturday 7pm to 6am

 

Bulloch County

SR 26                                                                                               

SR 26 Emanuel Co. Line to West of SR 67

Mill & Inlay of existing asphalt

Daily Lane Closures  7AM to 8 PM

Starting 10/1/2021 — 10/31/2021

 

Bulloch County

SR 26

Mill & Inlay of existing asphalt for 11 miles

Day Time Lane Closures

Starting10/11/2021

 

Clinch County

SR 168                                                                                              

MP 0 -7  Surface Treatment  and Micro-surfacing

Daily lane closures for asphalt overlay

 

Bulloch County

SR 26

Daily lane closures from MP 17 to MP 19

Concrete pavement repair and replacement.

 

Toombs County

SR 30

Weekend Lane closures between MP 3 to MP 8

Concrete replacement at several intersections

 

 

Other Traffic Interruptions

Effingham County

SR 17 @ Blue Jay Rd Roundabout                                               

Road Open as a 4 way stop.

Curb, Gutter, & Sidewalk installation

Daily Lane Closures  9am to 4:30pm

If weather permits, weekend detour 10/15 – 10/17 for

Roundabout construction

 

Bryan County

SR 144 @ I-95 Interchange                                                            

From Thunderbird Dr. to Longwood Dr.

Flagging operation for milling and paving

October 8 thru October 12 7 PM to 7 AM, Nightly

 

Camden County

SR 40                                                                                               

West of Grove Blvd to East to Truss Plant Road

Daily Lane Closures Monday thru Friday, 7am to 5pm

Widening and reconstruction for additional turn lanes

 

Tattnall County

US 301/US 25/SR 23 AT 196                                                          

Beginning South of Baxter Durrence RD and extending

North of Mile Field RD

Daily Lane Closures for construction of roundabout

Monday thru Friday (August 04, 2021 to January 31, 2022);

8am to 5pm

 

Toombs County

US 1/SR 4/ SR 15                                                                            

Beginning  Coogan Williams RD extending to US 1/SR 4

Extended date due to weather setbacks

Lane Closures for  striping to omit passing lane

Daily 8am to 5pm thru October 13

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *