Connect with us

Bulloch Local News

SEGA Summer Construction & Maintenance Scheduled This Week

Georgia Department of Transportation continues to improve highway infrastructure throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue this week, Monday, June 24 through Friday, June 28. Major projects of interest that will likely impact traffic are listed below.

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers.

Lane closures are listed below by county.

Bulloch County 
SR 73 Daily lane closures 7 am to 7 pm for Drainage Repairs

I-16 from SR 67 Overpass in Bulloch County to Candler/Emanuel County line
Intermittent lane closures for concrete grinding
Monday – Saturday 7 am – 7 pm

Bryan County
SR 144-Widening Project                   
Rabbit Hill Road Closure Detour via Rabbit Hill Rd. to Port Royal Road
In place until pipe Installment is completed

I-95 Southbound Hwy 17 overpass to Midway exit 76
Double lane closure to Mill and inlay existing I-95 Asphalt
Monday through Saturday 7 p.m. to 7 a.m.

Camden County
I-95 at Ardick Road overpass
Continuous 14-day Lane Closure in both directions
Starting Tuesday, June 24 for bridge rehab

I-95 Southbound St. Mary’s River Bridge to Exit 22
Double Lane Closure for Milling and Resurfacing
Sunday through Thursday 7 pm to 7 am

Candler County
I-16 from SR 67 Overpass in Bulloch County to Candler/Emanuel County line
Intermittent lane closures for concrete grinding
Monday – Saturday 7 am – 7 pm

Charlton County
SR 121 Daily lane closures for resurfacing 7 am till 7 pm.

Chatham County 
Island Expressway – Oakland Island Road to Elba Island Road
Single Lane closures for bridge replacement project
Monday through Friday 9 a.m. until 3 p.m.

SR 21 from SR 30 intersection to Long Street in Rincon
Nighttime lane closure for resurfacing
7 pm until 6 am Monday – Sunday

SR 25 Conn/West Bay Street 
Traffic Shift continuous on westbound outside lane

Effingham County
SR 275 Rincon-Stillwell Rd. to Long Bridge Rd.
Lane shift for concrete sidewalk construction in various areas
Wednesday – Friday 9:30 am until 2:30 pm

SR 30 Daily lane closures 7 am to 7 pm for Drainage Repairs

SR 119 Daily lane closures 9 am to 4 pm for Drainage Repairs

SR 21 from SR 30 intersection in Chatham County to Long Street in Rincon
Nighttime lane closures for resurfacing
7 pm until 6 am Monday – Sunday

Glynn County
SR 25/US 17 Sidney Lanier Bridge
Single Lane Closure for Bridge Rehab
Monday through Friday continuous lane closure

SR 27 Daily lane closures 7 am to 6 pm for vegetation removal

Liberty County 
I-95 Daily lane closures 9 am to 4 pm for Vegetation Removal

SR 25 Daily lane closures for resurfacing

Telfair County 
SR 132 Daily lane closures 6 am to 6 pm for asphalt crack seal

Ware County
SR 158 between Hutch Lane and Barnes Road
Road closure for three bridges to be replaced
anticipated open to traffic spring/summer 2020

This is a press release from GDOT.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *